Project development: Otada wind park

The park will feature four GE “Cypress” 5.5 MW wind turbines. Due to network bandwidth constraints, the turbines’ power capacity will be reduced to 4.5 MW, resulting in a total park capacity of 18 MW. GE “Cypress” wind turbines have a hub height of 151 meters and a rotor diameter of 158 meters.