Skip to content
Inikti
  • Who we are
  • Wind
    • Repowering
    • Wind Turbines Installation
    • Wind Turbines Dismantling
    • Maintenance Services
    • Blade services
    • Transport and Logistics
    • Projects development from green field to commissioning
  • Sun
  • Our Projects
  • Catalog
  • Partnership
  • Career
  • Contact Us
  • Deutsch
  • Polski
  • Lietuviškai
+37068721720
info@inikti.com

Maintenance: Replacement of blade bearings in two Nordex N90

You are here: Home > Maintenance: Replacement of blade bearings in two Nordex N90

Inikti team task was to replace the blade bearings in two Nordex N90 wind turbines. These turbines have a hub height of 80m and a rotor diameter of 90m.

Download WordPress Themes
Download WordPress Themes
Premium WordPress Themes Download
Download Nulled WordPress Themes
free download udemy course
download lava firmware
Free Download WordPress Themes
free download udemy paid course
Tags: Estonia

Post navigation

Maintenance: 19 X Nordex N117 Gamma
Construction: Four Enercon E70

Recent Post

  • Construction: Two Enercon E70

    2023 October 2

  • Installation and full scope services of two Enercon E138 EP3 E2 with hybrid towers.

    2023 September 25

  • Project development: Otada wind park

    2023 September 10

  • Construction: Two Enercon E70

    2023 October 2

  • Installation and full scope services of two Enercon E138 EP3 E2 with hybrid towers.

    2023 September 25

  • Project development: Otada wind park

    2023 September 10

  • News
  • Wind Turbine Installation
  • Wind Turbines Dismantling
  • Maintenance
  • Privacy Policy
Inikti.com
JSC INIKTI
302741780
+370 687 21720
info@inikti.com

All rights reserved 2022