The Inikti Wind team dismantled four Enercon wind turbines: two Enercon E40 0.6 MW and two Enercon E66 1.8 MW. The wind turbines were disassembled, cut into pieces, and transported for recycling. Additionally, the foundations of the wind turbines and electric cables were excavated. The site was completely cleaned and prepared for the construction of new wind turbines.