The park will feature four GE “Cypress” 5.5 MW wind turbines. Due to network bandwidth constraints, the turbines’ power capacity will be reduced to 4.5 MW, resulting in a total park capacity of 18 MW. GE “Cypress” wind turbines have a hub height of 151 meters and a rotor diameter of 158 meters.