Construction of two Enercon E70, 2,3MW wind turbines with hub height of 70 meters and a rotor diameter of 71 meters. Acme Solar wind park
Project development: Otada wind park
The park will feature four GE “Cypress” 5.5 MW wind turbines. Due to network bandwidth constraints, the turbines’ power capacity will be reduced to 4.5 MW, resulting in a total park capacity of 18 MW. GE “Cypress” wind turbines have a hub height of 151 meters and a rotor diameter of 158 meters.
Construction: Four Enercon E70
Construction of four Enercon E70, 2,3MW wind turbines with hub height of 70 meters and a rotor diameter of 71 meters. Acme Solar wind park
Maintenance: 19 X Nordex N117 Gamma
Maintenance of nineteen Nordex N117 Gamma 2.4MW wind turbines located in Mažeikiai, a region in north-west Lithuania.
Construction: Three Enercon E138
Construction of three Enercon E138 EP3 E2, 4.2MW wind turbines with a hub height of 131m and a rotor diameter of 138m.
Construction: Enercon E40
This time, we’re constructing Enercon E40 wind turbine in the northwest region. With a hub height of 78 m and a rotor diameter of 44
Construction: Enercon E66
Inikti team has constructed Enercon E66, 1,8MW wind turbine in the southwest of Lithuania.